Rendering of New Jackson County Health Department

 

Menu

 Home Page
 About JCHD
 Message from Administrator
 Birth & Death Certificates
 Breast & Cervical Cancer
 Chronic Disease
 Chronic Disease Newsletter
 Clinical/Medical Services
 Closing the Gap
 Contact Us
 Dental
 Employee Directory
 Environmental Health
 
 Healthy Start
 Human Resources/Jobs
 Immunizations
 Maps
 Newsletters
 School Health
 Services
 Social Services
 
 WIC
 
Here are links for your use:

Department of Health and State of Florida web sites


Jackson County, City of Marianna and Chamber of Commerce websites


Hospitals in Jackson County

Access Florida (Florida Medicaid, Food Stamps, etc.)


 

External links are provided for convenience only.  Their use does not constitute an endorsement by the Florida Department of Health.
 

PDF format - requires Adobe Acrobat Reader

 

 

JCHD banner with pictures of employees

 

 

Pictures of the new Jackson County Health Department

bottom of page

Rendering of the new health department

rendering of new Jackson County Health Department (569.18kb jpeg),  opens in new window  rendering of new Jackson County Health Department (452.41kb jpeg),  opens in new window 

Site Plan

floor plan of new Jackson County Health Department (45.84kb jpeg), opens in new window  floor plan of new Jackson County Health Department (45.42kb jpeg),  opens in new window

As of 10-18-2010

Aerial View 10-4-10 East Entrance (76.88kb jpeg), opens in new window   East Elevation Front Entrance 10-18-10 (13.17kb jpeg), opens in new window   Forming Concrete Cast-In-Place Rake Beam 10-18-10 (22.99kb jpeg), opens in new window   Section C Steel Trusses 10-18-10 (22.05kb jpeg), opens in new window   Southeast Elevation Section A Multi-Purpose 10-18-10 (16.47kb jpeg), opens in new window   Trusses, framing, furring, hvac, hangers sectiond 10-18-10 (30.86kb jpeg), opens in  new window


As of 11-8-2010

Aerial View 11-2-10 East Elevation (40.76kb jpg), opens in new window   Domestic Water, Electrical and Ductwork Rough-In Section D (45.06kb jpg), opens in new window   HVAC Chiller Piping and Duct Section D (47.24kb jpg), opens in new window   Multi-Purpose Room Duct and Roof Drain Piping (28.03kb jpg), opens in new window   Screen Wall at Northeast Elevation (24.14kb jpg), opens in new window   Southwest Elevation Section D (26.13kb jpg), opens in new window


As of 12-14-2010

Aerial View 12-2-10 East Elevation (45.43kb), opens in new window   Concrete Curbing Install and Screen wall at Porte Cochere (33.77kb), opens in new window   Duct Install Section C (40.50kb), opens in new window   Exterior Sheathing at Multi-Purpose Rm East Elev Sect A (34.36kb), opens in new window   Finish Block and Cast Stone Northeast Elevation of Section B (30.62kb), opens in new window   Section D Finish Block Southeast Elevation (30.93kb), opens in new window

As of 2-3-11

Aerial View 1-3-11 East Elevation (36.47kb), opens in new window   Ground Face CMU at Interior Lobby (24.82kb), opens in new window   Ground Face CMU-Columns Steel OutLookers Section Band Porte Cocheres (24.94kb), opens in new window   Metal Roofing Panel Install Section D (26.27kb), opens in new window   Metal Roof Panels East Elevation Section D (22.52kb), opens in new window   Steel Trusses at Porte Cochere (30.77kb), opens in new window

As of 2-7-11

2-3-11 Aerial View 1-3-11 East Elevations (36.47kb), opens in new window   2-7-11 Courtyard Corridor (35.92kb), opens in new window   2-7-11 Drywall Finishing AHU Delivery at Warehouse Section D (26.64kb), opens in new window   2-7-11 Ground Face CMU Columns Steel OutLookers sec B Porte Cochere (28.89kb), opens in new window   2-7-11 HVAC Duct and Piping Insulation Sect D (26.42kb), opens in new window   2-7-11 Interior Metal Stud Framing and MEP In Wall Rough In Sect A (33.06kb), opens in new window

As of 3-8-11

Aerial View 3-1-11 (EastElevation) (39.69kb), opens in new window   Columns & Outlookers at East Elevation Walkway (24.25kb), opens in new window   HVAC Duct Work Install In Section B (33.33kb), opens in new window   HVAC Units Instal lSectionD (32.13kb), opens in new window   Restroom Tile Install Section D (22.16kb), opens in new window   Structural Steel Erection at Dental Canopy (31.31kb), opens in new window

As of 3-28-11

Aerial View 3-1-11 East Elevation (41.45kb), opens in new window   City of Jackson County Gas Line and Meter Install (46.68kb), opens in new window   Courtyard Corridor and Window Wall Install Section D (35.16kb), opens in new window   Mechanical Room Piping Insulation (37.03kb), opens in new window   Metal Stud Framing and HVAC Duct Section B (36.09kb), opens in new window   Walkway Construction and Painting at East Entrance (34.46kb), opens in new window

As of 4-12-11

Aerial View 4-12-11 East Elevation (38.28kb), opens in new window   Connecting Walkway at Courtyard Area (34.25kb), opens in new window   HVAC Piping Rough In and Insulation Section A (41.74kb), opens in new window   Lay In Lighting and Cabinetry Install Section D (20.18kb), opens in new window   MEP In Wall Rough In Section B (36.51kb), opens in new window   Metal Roof, Wall Panel, Window Wall Install; Sect D (30.02kb), opens in new window

As of 4-18-11

Aerial View 4-12-11 East Elevation (38.28kb), opens in new window   Accent Paint, Ceiling Grid Lighting; Section D (16.78kb), opens in new window   Dental Canopy, Porte Cochere Metal Roofing; East Elev (23.45kb), opens in new window   Dental Canopy Roof Install, Wall Panels Install; North Elev (19.55kb), opens in new window   Metal Roof Wall Panel Soffit Install Sect D (24.90kb), opens in new window   Metal Roof Panel Install Multi-Purpose Room (34.48kb), opens in new window

As of 4-26-11

Aerial View 4-26-11 East Elevation (38.28kb), opens in new window   Covered Walkway at Buildings Entrance (30.98kb), opens in new window   Dental Canopy Covered Walkway to Section B (25.18kb), opens in new window   Metal Roof Panel Install Multi-Purpose Room (31.56kb), opens in new window   Metal Roof Wall Panel and Soffit Install Sect D (22.45kb), opens in new window   Porte Cochere Installation (30.09kb), opens in new window

As of 5-16-11

Aerial View 5-2-11 East Elevation (37.94kb), opens in new window   Connecting Walkway From Front Loggia to Porte Cochere (29.33kb), opens in new window   Exhaust Hood and Ducting at Kitchen Multi-Purpose Rm (33.45kb), opens in new window   Metal Stud Framing and Soffit Framing Section A Lobby Area (34.80kb), opens in new window   Sitework Grading, Curbing and Base North Elevation (26.68kb), opens in new window   Tile Flooring Install Section C (21.00kb), opens in new window

As of 5-25-11

Aerial View 5-2-11; East Elevation (37.94kb), opens in new window   Architectural Woodwork and Solid Surface Tops (18.35kb), opens in new window   Connecting Walkway Section D to Section C (21.66kb), opens in new window   Electrical Conduit, HVAC Piping, and Plumbing Piping (34.84kb), opens in new window   Restroom Fixture Install Section D (21.81kb), opens in new window   Sitework Grading, Curbing and Base; East Elevation (19.48kb), opens in new window

As of 6-20-11

Aerial View 6-01-11; East Elevation, opens in new window (35.34kb)   Courtyard Paver and Cast Stone Install, opens in new window (31.11kb)   Front Entrance Loggia, opens in new window (27.49kb)   Northwest Elevation at Animal Dissection Room, opens in new window (26.42kb)   Sitework Sidewalks, Curbing and Asphalt Base, open in new window (24.63kb)   VCT Doors and Hardware Install Section D, opens in new window (17.98kb)

As of 8-2-11

Aerial View 7-02-11 (East Elevation) (37.11kb), opens in new window   Courtyard Corridor Ceramic Tile Installation (26.68kb), opens in new window   Lobby Wood Ceiling Grid & Lighting Install at Monitor (27.66kb), opens in new window   Lobby Wood Ceiling Grid & Lighting Install at Monitor (18.82kb), opens in new window   Multi-Purpose Wood Ceiling Install (29.04kb), opens in new window   Room Finishes (22.02kb), opens in new window

 

Section A consists of the Clinic, the Front Desk, IT, and the Multi-Purpose Room
Section B consists of the Break Room and Dental
Section C consists of WIC, Social Services, Nursing Administration, School Health, and our Prison Program
Section D consists of the Warehouse, Environmental Health, Administration, and the Business Office Vital Statistics

 

                                                                                                                                                                                                                                  back to top

 

 

Email Advisory
Disclaimeropens in new window
Accessibility Information

DOH logo